Manufacturers' Representatives of Engineered Products
About Us
Products:
  By Manufacturer
  By Description
  Typically Stocked
News & Events
Sales To :
  Wholesale Distributors
  Contractors
  Industrial Users
  Commercial Users
  Residential Users
Our Distributors
Training
Technical Support
Our Specialties
Favorite Links
Returns / Warranties
Find Us
Contact Us
Home


TECHNICAL SUPPORT:
Radiant Design & Installation Services

Tubing Layout - $400.00

Tubing layouts and piping schematics are included in the total project price, and are provided after receipt of your purchase order. Preliminary layouts prior to purchase orders can be provided for the fee above. Drawings can be provided in digital or printed versions, and will be released upon receipt of payment.

Tool Rental - $50.00/Day

  • Pneumatic Stapler – The pneumatic staple gun is designed for radiant floor tubing and has a “tubing dam” which lines the staple with the tube to reduce tube damage. Use Infloor staples only.
  • Tubing Uncoiler – The tubing uncoilers allow the tubing to be uncoiled without binding or kinking, and reduce the installation time greatly.
  • Purge Cart – The purge cart is a mobile jet pump and mixing tank which can fill and purge your entire system quickly with water or water-glycol mixtures.

Rental time starts once the tool leaves the warehouse and stops when it returns. The per-day charge is in increments of 24 hours, including weekends. An additional day will be charged once the time exceeds a 24 hours increment. The rental equipment can be picked up during normal office hours. We can ship the stapler UPS Next Day to the customer, freight included.

Installation Supervision - $400.00

A representative from Kress Associates will be on hand to direct the installing contractor (or other sub-contractor) in the installation of radiant tubing and manifolds. The installing contractor is responsible for providing all tools and pressurization equipment. (We can provide a list of required tools, etc.) The service cost covers the installation supervision, a maximum of 4 hours at the job site, and travel within 100 mile radius. Additional time at the job site and/or for excessive travel will cost extra. All tubing, manifolds, and fittings, accessories, and required tools and equipment must be at the job site.

  • For concrete slab installations, all sub-grade preparation must be complete.
  • For staple-down pour-over installations, any additional sill plates, sleepers, and vapor barriers should be installed.
  • For staple-up installations, joist spaces should be accessible and free of piping, duct work, etc.
  • Power must provided for any tools and/or compressors.


Cancellations require 24 hours notice. No-shows or late cancellations will be charged the full rate. If the equipment is not fully present at the job site, service will be cancelled, invoiced for the full rate, and a return trip scheduled. Return visits will also be charged the full rate.

Adder for each additional hour - $100.00


   

copyright © 2001-2007 Kress Associates, Inc., All Rights Reserved
Web Design by The Technological Edge, Inc.